Centrica picks builder for £84m Barrow gas project

Centrica picks builder for £84m Barrow gas project

Centrica has picked engineering firm Costain as the main contractor for its £84 million project at the Barrow gas terminals in Cumbria.

Its generation business Centrica Energy is building a 1.1km underground pipe between the north and south terminals because of EU laws banning the sale of a refrigerant called freon from the end of 2014.

Freon is used to cool the gas piped to the south terminal as part of the process to clean it before it can be pumped into the National Grid.

Building has already started at the pipe which is set to be ready by the end of 2015.

Read more here http://www.energylivenews.com/2014/06/09/centrica-picks-builder-for-84m-barrow-gas-project/?utm_source=feedly&utm_reader=feedly&utm_medium=rss&utm_campaign=centrica-picks-builder-for-84m-barrow-gas-project

Source: Energy Live News

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s